Property Management case study

Property Management · Insight Assets + Insight Ledger, 22 staff

A property management firm administered a portfolio whose common-area assets — plant, safety equipment, fixtures across dozens of buildings — were tracked in a spreadsheet maintained by whoever touched it last. The insurance schedule was maintained separately by the broker. Depreciation was recalculated by hand each June.

The difficulty

The register and the insurance schedule had drifted into open disagreement: the broker listed 240 items, the spreadsheet 180, and neither matched the buildings. When a storm damaged plant across three properties, the claim took months because every item had to be evidenced from scratch. Maintenance was reactive by necessity — with no service history per asset, nobody could see a failure coming.

Project snapshot

  • SectorProperty Management
  • Modules deployedInsight Assets, Insight Ledger
  • Duration9 weeks, including the portfolio stocktake
  • Written up withClient permission; identifying detail removed

Numbers quoted in this study were measured by the client before and after the change — they are not our estimates. Where a figure could not be measured cleanly, it has been left out rather than rounded flatteringly.

What we changed

We loaded the broker’s insurance schedule as the authoritative starting list (the more disciplined of the two sources), then ran a scanning stocktake across the portfolio with barcode labels: every asset found, added, or reconciled against the schedule, with variances reported to the directors weekly. Insight Assets took over depreciation on the schedules the accountants already used, and the maintenance calendar was populated from the service records that survived. Insight Ledger integration connected asset purchases to the right cost centres from the day of go-live, so the register now updates itself from procurement.

The results

  • Register and insurance schedule reconciled to within a handful of deliberately uninsured items.
  • The following storm claim settled in weeks, evidenced from the register directly.
  • June depreciation runs in an afternoon, reviewed rather than recalculated.
  • Reactive call-outs are down; the calendar surfaces what is due before it fails.
The register and the schedule, drifting apart
One list, reconciled item by item
Variance reporting

The stocktake reported variances weekly, and the register reconciled with the insurance schedule item by item.

If your organisation looks like this one

If you suspect the register has drifted, reconcile the schedule at the next insurance renewal, before you sign it. Anchor on the most disciplined list (usually the broker’s), label everything that moves, and use software that updates the register from procurement.

To see how a project like this would run against your own calendar and numbers, ask us for a written quote — A register rescue is scoped from your insurance schedule in a single workshop.

Questions this case study raises

Was the stocktake disruptive to the properties?
Less than expected, because it ran as a scanning exercise coordinated with routine site visits rather than a shutdown audit. Each building took a morning; the portfolio completed over three weeks; and the variance reports went to the directors weekly, so the register was visibly converging rather than silently correcting. The storm that arrived a year later was the test the project had unknowingly prepared for.
What would you do differently?
Involve the insurance broker from the first workshop rather than the second — the schedule reconciliation produced a dozen valuation questions a broker could have answered on the spot. The firm now renews each year with the register as the schedule, which was always the plan; the second workshop would simply have been a phone call.